5 Bbl Beer Factory Equipment/ Complete Set Brewing Systems

US$33,800.00 - 39,800.00 1 Set (MOQ)
Port:
Qingdao, China
Production Capacity:
10sets/Month
Payment Terms:
T/T, Money Gram

Last Login Date:

Apr 10, 2020

Business Type:

Manufacturer/Factory, Trading Company

Main Products:

1000L Beer Equipment, 500L Beer Brewing Equipment, 10bbl Brewery Equipment, 2000L Fermentation Tank, 50L Home Brewing Equipment, Commercial Used Beer Brewing Equipment, Industrial Beer Equipment, Large Beer Brewery Equipment, Micro Beer Brewery Equipment, Customized Beer Equipment

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
DG-a10
Condition
New
Customized
Customized
Voltage
220V
Composition
Brewery Equipment
Processing Material
Stainless Steel
Process
Ferment
Trademark
Degong equipment
Transport Package
Inner with Stretching Membrane and PE Paper; 20-35
Specification
5bbl
Origin
China
HS Code
8438400000

Product Description

5 bbl beer factory equipment/ complete set brewing systems         

1. Name: 5 bbL beer brewery equipment.

 

2. Heating way: electric or steam available.

3. Cooling: glycol.

4. Control: semi-auto or PLC if necessary.

 

5. mill machine: 200kg/h.

6. mash boiling/ lauter/ whirlpool tun: 1000 liters.

7. fermenters: 6 piceces 6 bbl liters(adjustable as your requirement).

8. ice water tank: 1 picece 1000 liters(adjustable).

9. refrigerating unit: 5P(1 P = 0.735kw).

10. wort pump: 2 piceces, 3000L/h.

11. plate heat exchanger: 10 m2.

12. Needed square: 40 m2.

13. Lead time: 35 working days.

14. fermenting time: 8- 12 days.

15. mashing time(per brew): 8 hours.

16. warranty: 36 months.

Specilized products

Nano personal home brewing equipment, 50L/D;

Micro SUS beer brewery equipment, 100L/D- 500L/D;

Micro red copper brewing equipment for pubs, bars, restaurant, 100L/D- 500L/D;

Medium and large-sized SUS brewery equipment, 500L/D- 3000L/D;

SUS tanks for beer brewing, such as fermenter, brighter, etc;

Relevant spare parts for beer brewing.

Consisting units

Milling system 

 

 

 

 

 01. mill machine  

 02.malt lift machine

Mashing system 

 

 

 

 01. mash & boil tank   

 02. lauter & whirlpool tank   

 03. mill machine   

 04. wort pump  05. plate heat exchanger

 06. saccharification combination pipeline  

 07. pipeline & valve VLV

 08. wort measuring meter  

 09. venturi tube

 10. measuring cylinder  

 11. titanium rod  

 12. rake

 13. operation platform

Fermentation system 

 

 01. fermentation tank   

 02. bright beer tank(optional)   

 03. yeast adding tank

 04. food tube   

 05. refrigerant pipelines(keep warm tube)

 06. electromagnetic put air out  

 07. electronic gauges  

 08. valve pipe fittings

Cooling system 

 

 

 

 01. Ice water tank

 02. refrigerating unit

 03. circulate pump  

 04. pipeline & valves

Control system 

 

 

 01. mashing control  

 02. fermenting control

 03. coling control  

 04. cleaning control

Cleaning system 

 

 

 

 01. Washing pump(moving)  

 02. Alkali tank  03. Sterilization tank

Accessory

Certification

Trade terms: FOB QINGDAO/ CIF/ CFR.

Payment condition: 30% T/T advance, balance 70% T/T before shipment.

Warranty: 36 months.

Certification: CE2000/ ISO9001.

Service: customization and debugging/ installation and personnel training/ brewing formula and drawing design.






 

Send your message to this supplier
Mr. Sonna Wang

Post a Sourcing Request Now

People who liked this also liked