500L Micro Beer Brewing Equipment, Beer Making Machine
US$50,000.00 - 60,000.00 | 1 Set (MOQ) |
Degong Equipment Technology Co., Ltd. Jinan
Shandong, China
Last Login Date:
Apr 10, 2020
Business Type:
Manufacturer/Factory, Trading Company
Main Products:
1000L Beer Equipment, 500L Beer Brewing Equipment, 10bbl Brewery Equipment, 2000L Fermentation Tank, 50L Home Brewing Equipment, Commercial Used Beer Brewing Equipment, Industrial Beer Equipment, Large Beer Brewery Equipment, Micro Beer Brewery Equipment, Customized Beer Equipment
Product Description
Company Info
Basic Info.
Product Description
Mash and fermentation systems
1.Mash/lauter tank | a.Used for the malt mashing and wort filtrating b.Material adopt stainless steel 304,double wall SS304 c.Welding and polishing processing on surface welds grinded to Ra 0.6um d.Inner equip with 360 degree omni bearing cleaning ball e.Insulation:polyurethane -thickness100mm f.On the surface of the tank equips with manhole,temperature gaugeetc |
2.Boiling/whirlpool tank | a.Used for the wort boiling(Adding the hops) and whirlpool b.Material adopt stainless steel 304,double wall SS304 c. Welding and polishing processing on surface welds grinded to Ra 0.6um d.Inner equip with 360 degree omni bearing cleaning ball e.Insulation:polyurethane -thickness100mm f.On the surface of the tank equips with manhole,temperature gaugeetc |
3.Hot water tank (Choose by yourself) | a.Used for heating the water to supply the mash/lauter tank b. Material adopt stainless steel 304,double wall SS304 c. Welding and polishing processing on surface welds grinded to Ra 0.6um d.Inner equip with 360 degree omni bearing cleaning ball e.Insulation:polyurethane -thickness100mm f.On the surface of the tank equips with manhole,temperature gaugeetc |
1.Fermentation tank | a.Used for the main fermentation of the beer b.Double wall stainless steel 304,mirror finishing c. Insulation: Polyurethane-thickness100 mm. d.Equipment with:Cone 60 or 72 ,resist compression design,dripping temperature drop e. Surface: Finish 2B - cold-rolled, annealed, pickled f. Vessel Pressure: 1.5 bar / 3.0 bar |
2.Bright beer tank | a.Used for the after fermentation of beer,improve the mature of beer and keep in storage b. Double wall stainless steel 304,mirror finishing c. Insulation: Polyurethane-thickness100 mm. d.Equipment with:Cone 150 ,resist compression design,dripping temperature drop e. Surface: Finish 2B - cold-rolled, annealed, pickled f. Vessel Pressure: 1.5 bar / 3.0 bar |
Cooling system
Cooling equipment: Ice water tank Refrigerating unit Circulate pump | Ice water tank(with cooling jacket),Refrigerating unit,Circulate pump Ice water medium choose industrial alcohol or edible alcohol (not including cl -), water dilution to 25% Feed method: ethylene glycol or alcohol water from the tank top manhole door a injection, refrigeration water since the ice water tank top into Discharge mode: ethylene glycol water since the ice water tank bottom of ethylene glycol out pipe discharge, refrigeration water since the ice water tank bottom cooling water back to the tube discharge The refrigerating unit for water tank water cooling, through the cycle to fermentation tank, through the plate heat exchanger to heat wort cooling. |
Cleaning system
1.Washing pump | a.SS anticorrosion pump b.Power:0.75KW lift:18m Rev:2880r/min |
2.Alkali tank | a.Stainless steel304, thickness: 2mm b.Inner surface treatment: welds grinded to Ra 0.6µm. c.Material all adopt the international standard of 304 stainless steel, all welding are argon protection single-sided, double-sided forming. |
3.Sterilization tank | a.Stainless steel304, thickness: 2mm b.Inner surface treatment: welds grinded to Ra 0.6µm. c.Material all adopt the international standard of 304 stainless steel, all welding are argon protection single-sided, double-sided forming. |
Controlling Unit
Brewhouse control panel | Temperature display and Auto/Manu heating Control for brewhouse tanks |
Fermentation tank control panel | Temperature display and Auto/Manu Control for FVs and BBTs |
OUR SERVICES:
a.) Free consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Free debugging instruction of equipment until everything is functional;
d.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer;
e.) New production techniques;